Larvikittblokka picks Rubb AS’ mining solution

Larvikittblokka picks Rubb AS’ mining solution

Rubb AS has supplied stone mining company Larvikittblokka with a 15m span x 25m length x 6.4m sidewall FH hall.

Rubb AS supports Kvaener for world’s first floating wind farm project

Rubb AS supports Kvaener for world’s first floating wind farm project

Rubb AS completes its 4th Rubb Hall for Rosenberg Worley

Rosenberg Worley has once again chosen Rubb AS to supply a storage solution.

Volda Byggservice chooses Rubb AS for FXF storage solution

Rubb AS have supplied masonry and concrete specialist Volda Byggservice with a new 15m span x 20m length x 5m long FXF Rubb Hall.

Rubb AS supplies split solution for Eon Element

Rubb AS has supplied eco-construction company Eon Element with a 20m span x 40m length x 6m sidewall Rubb Hall.

Rubb’s the favourite with bespoke horse riding arena

Rubb has designed, constructed and installed an FXI for a horse riding school.

Rubb lands contract to design, fabricate and erect new 300ft MRO hangar

Rubb Building Systems has landed a contract to design, fabricate and erect a new 300ft MRO (Maintenance, Repair, Overhaul) hangar. 

Does Rubb’s Thermohall® system also insulate sound?

Rubb’s Thermohall® insulation is well known for its temperature control, but did you know it also insulates sound?

The Fabric Engineer 2020 – Out Now

The Fabric Engineer is a yearly magazine that looks back on the biggest and best projects from across the Rubb Group.

Discussing Skien Harbour’s third Rubb hall with Ove Gunleksen and Erik Storhaug

Developing halls that can withstand the harshest of weather has been a staple of Rubb AS since 1966. 

Aludesign expands with Rubb hall

The construction of a new storage hall attached to an existing production facility may seem to be a simple task, but erecting a warehouse without one wall is a great challenge in terms of design and assembly.

Rubb Poland completes Seepoint print house project

Multiple roof pitches, contrasting cladding colour on the inside of the hall, two different heights of the side walls – all of these specifications were included in the design of a storage hall for Seepoint print house in Goleniów.

Dukesway
Team Valley Trading Estate
Gateshead
Tyne and Wear
UK

Stay Connected

Get involved with the latest Rubb Group news and events on social media.

Search Rubb Group

Stay up to date

Sign up to the Rubb Group newsletter to stay up to date with the latest Rubb news, product development and news..

© 2020 Rubb Group. All rights reserved.