Third building planned for Norwegian seafood company’s expansion

Grøntvedt Pelagic is set to expand its cold storage capacity even further with the addition of a third Rubb hall.

Grøntvedt Pelagic, one of Norway’s leading producers of herring, salted fish, dryfish and clipfish, chose Rubb as the supplier for their third warehouse project at Ørland in Sør Trøndelag.

Rubb has already delivered an 30m x 108m x 5m hall, insulated with 150 mm Glava pro 34 insulation. This facility is divided into two areas with a ThermoWall partition and is used for maturing and storage of barrels of herring prior to export. The structure has two temperature zones.

Grøntvedt then expanded with a second 30m x 152m x 5m Thermohall, with the same insulation thickness, and two ThermoWall partitions inside, providing three temperature zones.

The third structure will measure 30m x 200m x 5m and will connect to the original structures. This facility include three ThermoWall partitions, creating four temperature zones. The latest building will be used to produce and repackage products, which required a larger amount of space.

The partitions were all supplied with 100mm insulation.  All structures include specialist insulated doors.

The buildings are energy efficient, with a quick construction time and are perfect for this kind of cool storage.

Categories

Press Contact

Press Contact

Clare Wilson

+44(0)191 482 22 11

c.wilson@rubb.co.uk

Contact Details

Location

Rubb Group

Sundvollhovet Industriområde 3535 Krøderen Krødsherad

Dukesway
Team Valley Trading Estate
Gateshead
Tyne and Wear
UK

Stay Connected

Get involved with the latest Rubb Group news and events on social media.

Search Rubb Group

Stay up to date

Sign up to the Rubb Group newsletter to stay up to date with the latest Rubb news, product development and news..

© 2018 Rubb Group. All rights reserved.